In progress
A listed facade over a city-centre street
Manchester city centre, 2026
Eight lifts on a listed facade, with a pavement licence and a covered walkway so the street stayed open.
Recent jobs, from a re-roof in Altrincham to a listed facade over one of the busiest streets in the city.

Manchester city centre, 2026
Eight lifts on a listed facade, with a pavement licence and a covered walkway so the street stayed open.
Altrincham, 2025
Up on a Monday, a temporary roof on by Wednesday, and down the day the roofers finished.
Wigan, 2026
Plot by plot alongside the bricklayers, with stair towers and loading bays.
Salford, 2025
A licensed scaffold with a lit, boarded walkway, so the shops below stayed open.
Bolton, 2025
A chimney scaffold tied through the windows, so nothing was drilled into the stone.
Stockport, 2026
A full-height scaffold, designed by an engineer, for a mill being turned into flats.